Manitowoc CVD1375 Spécifications Page 80

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 204
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 79
–74–
Freeze Sequence
3. Prechill
The compressor is on for 30 seconds prior to water
flow to prechill the evaporator. The water fill valve
remains on until the water level probe is satisfied.
4. Freeze
The water pump restarts after the 30-second prechill.
An even flow of water is directed across the
evaporator and into each cube cell, where it freezes.
The water fill valve will cycle on, then off one more
time to refill the water trough.
When sufficient ice has formed, the water flow (not the
ice) contacts the ice thickness probe. After
approximately 7 seconds of continual water contact,
the Harvest sequence is initiated. The ice machine
cannot initiate a Harvest sequence until a 6-minute
freeze lock has been surpassed.
Vue de la page 79
1 2 ... 75 76 77 78 79 80 81 82 83 84 85 ... 203 204

Commentaires sur ces manuels

Pas de commentaire